Skip to content
US tree service companies only · Calls answered in US hours · Founding-client pricing until December 15, 2026
Lirevon

Free tool

Crew capacity and revenue planner

By Umair Nawaz, founder of Lirevon Updated How we test tools

See the most your tree crews can bill. Enter your crews, jobs per crew-day, working days and average ticket. You get a monthly and yearly revenue ceiling, what your current utilization leaves on the table, and what one more booked job a week is worth.

1. Your crews

2. How full are your days?

Estimates

Yearly revenue ceiling

–

Monthly ceiling

–

Jobs per month at full

–

Booked per month

–

Left on the table per year

–

Value of 1 more job(s) a week

–

Estimates only, built from the numbers entered. Revenue, not profit. Not a forecast.

Next: see what slow replies cost in the speed-to-lead calculator, or what missed calls cost in the missed-call cost calculator.

The formula

  1. Jobs per month at full = crews × jobs per crew-day × working days per month.
  2. Monthly ceiling = jobs per month at full × average ticket.
  3. Yearly ceiling = monthly ceiling × months you work at this pace.
  4. Booked revenue = ceiling × utilization.
  5. Left on the table = ceiling − booked revenue.
  6. One more job a week, per year = extra jobs × average ticket × 52 weeks × (months worked ÷ 12).

How to use your revenue ceiling

A tree crew is a fixed cost. You pay wages, the truck, the chipper, fuel and insurance whether the crew works eight hours or sits in the yard. That is why one number matters so much: how many of your crew-days turn into paid jobs. This planner shows that number in dollars, so you can decide what to fix first.

Start with honest inputs

The starting numbers in the form are only starting points. Replace them with your own. For jobs per crew-day, count your jobs and your crew-days over the last month and divide. For working days, take out rain, holidays and repair days. For average ticket, add up what you invoiced and divide by the number of jobs. If a few huge jobs make your average look high, try a lower ticket too and see how the ceiling changes.

Read the ceiling as a limit, not a goal

No crew runs at 100% all year. Storms, breakdowns and travel eat time. The ceiling tells you the top of the room. If your yearly ceiling is well below the revenue you want, no amount of marketing will fix it, because you do not have the crew capacity. If your ceiling is far above what you bill, the problem is filling the days, not hiring.

Use the utilization slider

Move the slider to the share of crew-days you really book. Watch the "left on the table" number. That is the revenue your existing trucks and people could earn without you buying anything new. For many small tree companies this is the cheapest growth there is. A crew that is booked 60% of the time can add a lot of revenue by getting to 75%.

Where empty days come from

Empty days usually come from a few simple things. Calls that go unanswered while the crew is up a tree. Quotes that get no follow-up. Jobs that are booked three weeks out because the schedule has no gaps. And slow seasons with no plan. Invoca reports that about 27% of calls to home-service businesses go unanswered, and under 3% of those callers leave a voicemail. Your own number may be different, so test it with the answer rate test.

What one more job a week is worth

The last box shows the yearly value of extra booked jobs every week. It is a good way to judge any change. If a missed-call text, a faster reply or a follow-up message books one more job a week for you, this is what it adds, as revenue. It only counts if the crew has room to do the work, so check the utilization slider first. If you are already near 100%, extra jobs mean overtime or a longer wait for customers.

Before you add a crew

A new crew adds capacity, but it also adds cost before it adds revenue. Compare the added ceiling to the loaded cost of the crew, using the crew day rate calculator. Then ask whether you can fill the days you already have. If you cannot answer the phone and book jobs now, a third truck will only add a third crew sitting idle. Read more in our guide on hiring and crews.

This tool counts revenue only. It does not know your costs, your taxes or your weather. Use it to ask better questions, then check the answers against your books. See also the profit margin calculator, our services and our pricing if you want help catching more calls.

Questions about crew capacity

What is a crew revenue ceiling?

It is the most money your crews could bill in a month if every crew-day was fully booked at your average ticket. It is a planning number, not a promise. Real months fall below it because of weather, breakdowns, travel and gaps in the schedule.

How many jobs can a tree crew do in a day?

It depends on the work. A big removal with a crane can fill a whole day for the crew, while trims and small removals can be two or three stops. Count your own last 20 working days and divide jobs by crew-days to get your real number.

What is utilization and why does it matter?

Utilization is the percent of your available crew-days that are booked with paid work. A crew costs you wages, truck and insurance whether it works or sits. Low utilization means you pay for capacity you do not sell.

Should I add a crew or fill the days I have?

Check utilization first. If your crews are nearly always booked and customers wait weeks, a new crew may pay off. If there are open days, answering more calls and following up better usually costs far less than a new truck.

How do I find my average ticket?

Take your total billed revenue for a recent period and divide by the number of jobs. Use real invoices, not quotes. Large jobs can pull the average up, so you can also try a lower number to be safe.

What do I use for working days per month?

Count the days your crews really work, after weather, holidays and repair days. Many owners start near 20 and then lower it for their slow season. Change it and watch the ceiling move.

What does "one more job per week" mean?

It shows the yearly value of booking just one extra job every week at your average ticket. It helps you see what answering a missed call, or sending one extra follow-up, could be worth. It is an estimate, not a forecast.

Why is my real revenue lower than the ceiling?

The ceiling assumes full days at full price. Rain, travel, equipment trouble, quotes that never book and open days all pull it down. The utilization slider shows what that gap looks like in dollars.

Does this include profit or costs?

No. It only counts revenue. To see profit, use the profit margin calculator or the crew day rate calculator and compare the revenue to what each crew costs you.

Is anything I type sent to Lirevon?

No. The math runs in your browser. Your numbers are only kept in this browser on this device so the form is filled in next time. Clear your browser data to remove them.

Fill the empty days

A full crew needs a full phone line.

Lirevon sets up missed-call text-back, an AI receptionist, follow-ups and review requests for tree companies, so the calls that would fill your open crew-days get answered.

Free, 30 seconds

Get your free Never-Miss score

Type your business name and city. We run quick checks on your website and Google listing and show a score out of 100, with your top three fixes. No sign-up needed.

We will not show this again for 7 days.

Powered by Lirevon