Crews and jobs
Storm capacity planner
Plan a storm week: crews, jobs per day and expected calls. See days to clear emergencies and a full-up text.
Open the tool: Storm capacity plannerGuide
After a big storm, your phone fills up and every job is urgent. Your costs go up, and so does the pressure to name a price fast. This guide shows how to set emergency rates you can defend, handle insurance-paid jobs the right way and stay clear of price-gouging rules.
By Umair Nawaz, founder of Lirevon Updated How we check facts
Short explanation, not legal advice.
On a normal week, customers get two or three quotes and the market keeps prices honest. After a storm, customers cannot wait and there are not enough crews. Three things make storm pricing its own problem.
Storm work often means night hours, overtime, more fuel, a crane on short notice, hung-up limbs under tension and wood that can move in ways you do not expect. A higher price can be fair when it matches higher real costs and higher risk.
A homeowner with a tree on the roof will often say yes to the first number they hear. That is exactly why price-gouging laws exist, and why a fair price, written down, protects you as much as them.
After a declared emergency, state officials may ask the public to report high prices. A complaint can cost you far more than one job is worth.
The goal is a price you could explain, line by line, to the customer, their insurer or a state official.
Price gouging means charging far more than normal for needed goods or services during an emergency. The rules come mostly from states and differ from place to place. Here is the general picture. This is a short explanation, not legal advice.
Keep your normal prices in writing, with a date. Keep receipts for storm costs. Make sure every storm price traces back to one or the other. If a price jump is bigger than your cost jump, stop and rethink it.
A fair emergency rate is not a guess. It is your normal rate plus real, named extra costs. Build it in five steps.
Your everyday pricing is the base. If you do not have a written price guide yet, build one before the next storm, so you have proof of what you charged before.
List what actually costs more: overtime pay (under federal law, most non-exempt employees get at least 1.5 times their regular rate for hours over 40 in a week), night lighting, extra fuel, short-notice crane or equipment rental, and extra disposal. Each line should be a real cost you can show.
A tree split and leaning on a house is harder and more dangerous than the same tree standing. It is fair to charge more for harder work. Describe the reason in the estimate, such as "tree under tension on the roof, rigging and crane needed," not a vague "storm fee."
Use one storm rate sheet for every customer. Do not raise prices because a caller sounds desperate, lives in a nicer area or says insurance will pay. Same work, same rate.
Price the urgent part (getting the tree off the house, clearing the driveway, tarping help if you offer it) separately from the non-urgent part (cutting up wood, stump grinding, hauling debris). It keeps the emergency bill smaller and clearer.
To work out your own numbers, use the crew day rate calculator for labor and the crane job cost calculator for crane days. For the basics of everyday pricing, read the guide to pricing tree work. Every result from those tools is an estimate based on your own inputs.
Decide storm prices on a calm day in spring, not at midnight with a tree on a roof. A one-page storm rate sheet should include:
Give a copy to anyone who answers your phone, so every caller hears the same thing. The price guide builder helps you put your normal prices on paper first.
Many storm jobs involve a homeowner's insurance claim. That is good for the customer, but it adds rules for you. Four points keep you out of trouble. This is a short explanation, not legal or insurance advice.
In most cases your customer is the property owner, not the insurance company. The homeowner is responsible for paying you. Insurance may pay them back, in part or in full. Say this plainly in your estimate so nobody is surprised.
Many homeowner policies help pay to remove a tree that fell on a covered building, and many have limits for tree and debris removal. A tree that fell in the yard without hitting anything may not be covered at all. Only the homeowner's insurer can say what is covered. Do not promise a customer that insurance will pay.
In many states, only the homeowner, a licensed public adjuster or a lawyer may negotiate a claim for the homeowner. You can give the homeowner an itemized estimate, photos and an invoice to send in. That is help, not negotiation.
Offering to "eat" or "waive" the deductible, or inflating the bill so the deductible disappears, can be insurance fraud and is illegal in some states. Price the job the same way whether insurance is paying or not.
Customers will ask about your own insurance too. Have your certificate ready, and read the guide to insurance for tree services and the insurance certificate checklist.
Good paperwork makes a high storm price a fair one. It also gets you paid faster, because everyone can see what they are paying for.
Even in an emergency, get a short written estimate approved by signature, text or email before the saw starts. Include the price or rate, what is and is not included, and the payment terms.
Take wide shots and close shots of the damage, the tree position, power lines (from a safe distance), and the finished site. Photos support your price and help the homeowner's claim.
List crew hours, each piece of equipment, disposal, and any outside rental with its cost. Match the words to your rate sheet. Avoid one-line invoices like "storm cleanup."
A deposit can be fair, especially when you rent a crane. Keep it reasonable, explain what it covers, and give a receipt.
Free tools that help: the estimate template, the job photo checklist and the job deposit calculator.
Not sure about a pricing habit? Check this table. The right column is not always illegal, but it often leads to complaints, bad reviews or legal trouble.
| Fair and easy to defend | Risky |
|---|---|
| One storm rate sheet, written before the storm, used for every customer. | Making up a price on the spot based on how worried the caller sounds. |
| Higher prices that match real cost increases you can show. | A flat "storm fee" with no explanation. |
| A written estimate, approved before work starts. | Starting work and naming the price when the tree is already down. |
| An itemized invoice with hours, equipment and disposal. | One big number with no detail. |
| Same price whether or not insurance pays. | A higher price because "insurance will cover it." |
| Giving the homeowner photos and an invoice for their claim. | Talking to the adjuster on the homeowner's behalf, or offering to cover the deductible. |
Print this or copy it into your storm plan. Work through it before the season, then again each time a big storm is on the way.
For the rest of your storm plan, see the storm season guide, the storm response checklist and the storm capacity planner.
In a storm, a fast reply helps you win the job. Read the missed calls guide, see our services, check pricing or ask for a free audit. Lirevon is new and has no tree-service clients yet; first case studies are planned for December 2026.
Often yes, if the higher price matches higher real costs such as overtime, equipment rental and risk. But many states limit price increases after a declared emergency, and the rules differ. This is a short explanation, not legal advice. Read your state attorney general's page and ask a local lawyer.
It depends on your state. Some states set a percent limit above your normal price. Others ban prices that are unconscionable or excessive. Most rules only apply during a declared emergency. Records of your normal prices and storm costs are your best defense.
There is no single right number. Start from your normal rates, add each real extra cost (overtime, night lights, crane rental, fuel, disposal), and price harder, riskier work fairly. Write it down before the storm and use the same sheet for every customer.
No. Price the job the same way whether or not insurance pays. Charging more because of insurance can look like fraud and can break state laws. Give a clear itemized bill instead.
You can answer questions about your own work, estimate and photos. But in many states, negotiating a claim for the homeowner is only allowed for the homeowner, a licensed public adjuster or a lawyer. Check your state rules before doing more than sharing your paperwork.
Do not do it. Waiving or covering a deductible, or padding the bill to hide it, can be insurance fraud and is illegal in some states. Compete on speed, safety and clear pricing instead.
In most cases the homeowner pays you, and their insurer may pay them back. Put that in your estimate in plain words, along with your deposit and payment terms, so nobody waits on a check that is not coming.
A reasonable deposit is common, especially when you rent a crane or other equipment for the job. Explain what it covers, give a receipt, and keep it in line with your real costs. Some states have rules on contractor deposits, so check yours.
Keep your dated rate sheets, estimates, approvals, photos, invoices, rental bills and fuel receipts from before and after the storm. They show what you charged before and why storm prices were higher.
This page is general information, not legal, tax or insurance advice. Price-gouging, insurance and contractor rules differ by state and city. Check your state attorney general's website and talk to a local lawyer about your own business.
Keep reading: storm guides, Lirevon for storm season, change order, written estimate.
Fair prices, clear paperwork and fast replies win storm work. Get a free audit, see the services or check pricing.